Hotels - Post

Hotels - Hotel Post Victoria
Location: Soprabolzano – Italy
Installation Year: 2015
Description: The work conducted in this facility revealed a key feature of Energia Europa’s projects: E Power does not require complex building installation work and the modification of existing systems, a crucial factor especially in century-old historic buildings as in this case.
Loads managed: Refrigerators, dishwashers, industrial laundry, pumps, lighting, compressors, PCs.
Electrical system output: 55 kW
Annual power consumed: 189,334 kWh
Measured savings: 6.28%
FIND OUT ALL THE ADVANTAGES OF OUR ENERGY EFFECIENCY SOLUTIONS
Through our projects in the hotel and restaurant sector, we can improve energy efficiency with no need to conduct significant work.