3,50%
Average saving measured
3.506.000 kWh
Energy saving
1.227.000 Kg*
Amount of CO2 recovered
Peroni – Italy
Birra Peroni is an Italian beer producer with excellent ingredients, such as 100% Italian malt and premium corn. Founded in Vigevano in 1846 by Francesco Peroni as a small factory with an adjoining brewery open to the public, today it is part of the Japanese Asahi Group. In Italy it owns 3 plants, in Rome, Bari and Padua and a malt plant in Pomezia (Rome), employing over 750 employees throughout the national territory. The annual production amounts to more than 6,000,000 hectolitres, of which more than 2,000,000 are exported to the 71 foreign markets in which it is present.
The project
In June 2015 Peroni decided to install the first EP system at the Padua plant as a pilot project, an EP1400A.
The power used in the plant is about 850 kW for an annual consumption of about 3,400,000 kWh. The load configuration consists of machinery with and without inverters, compressorsand fans for air conditioning and electronic lighting:
1 – Inverter Machinery: 45%
2 – Non-Inverter Machinery: 21%
3 – Heating, Ventilation and Air Conditioning: 30%
4 – Electronic and traditional lighting: 4%
In 2016 was installed one EP device of 2,500A always on the Padua site and 2 more devices of 2,500A and 1,400A on the Bari plant, while in the following year an additional EP of 1,400A was installed at the production site in Rome.