{"id":1974,"date":"2025-10-13T12:11:44","date_gmt":"2025-10-13T10:11:44","guid":{"rendered":"https:\/\/energia-europa.com\/?post_type=referenza&#038;p=1974"},"modified":"2025-10-13T12:43:59","modified_gmt":"2025-10-13T10:43:59","slug":"metalworking-industry-meshanics","status":"publish","type":"referenza","link":"https:\/\/energia-europa.com\/en\/reference\/metalworking-industry-meshanics\/","title":{"rendered":"SIT ITALY"},"content":{"rendered":"\n<h2 class=\"wp-block-heading has-text-align-center\"><strong>4,90%<\/strong><\/h2>\n\n\n\n<p class=\"has-text-align-center has-medium-font-size\"><strong>Average saving measured<\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-center\"><strong>5.515.000 kWh<\/strong><\/h2>\n\n\n\n<p class=\"has-text-align-center has-medium-font-size\"><strong>Energy saving<\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-center\"><sub><strong>1.930.000 Kg<\/strong><\/sub>*<\/h2>\n\n\n\n<p class=\"has-text-align-center has-medium-font-size\"><strong>Amount of CO<sub>2 <\/sub>recovered <\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Sit Italy<\/h2>\n\n\n\n<p>The Sit Group creates solutions for climate control and consumption measurement. SIT was founded in 1953 under the name of Societ\u00e0 Italiana Tecnomeccanica \u201cLa Precisa\u201d as it operates in precision mechanics. Today Sit is an international group with logistics HUBs and commercial offices in Europe, America, Asia, Africa and Australia.<br>The 8 production sites and the research site are located in Italy, in Padua, Rovigo and Macerata, as well as in the Netherlands, Romania,<br>Mexico, China, Tunisia and Portugal. More than two thousand people work directly in the SIT Group. SIT is committed to the manufacturing of products with low environmental impact, reducing energy consumption and developing systems for a low level of air pollution.<\/p>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">The project<\/h2>\n\n\n\n<p>In October 2015 was installed the first 1600A EP device at Rovigo plant, where mechanical control systems, sensors, gas meters and other precision instruments are produced. The configuration of the loads managed by this first cabin consists mainly of inverter-free machinery and air conditioning, for a used power of about 900 kW and an energy consumption of about 5,000,000 kWh:<\/p>\n\n\n\n<p><br>Cabin 1 &#8211; EP1800A:                                                                                                                                                                                                                                                                                                                                                                                           <\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Non-Inverter Machinery: 90%<\/li>\n\n\n\n<li>Heating, Ventilation and Air Conditioning: 8%<\/li>\n\n\n\n<li>Traditional lighting: 2%.<\/li>\n<\/ul>\n\n\n\n<p>Over the next 3 months were installed two further devices of 1,000A and 1600A on other lines of the plant, with a used power of 450 kW and 830 kW respectively. The configuration of the loads managed by these two lines is quite different, being a logistics center and aproduction line:<\/p>\n\n\n\n<p>Cabin 2 -EP1000A:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Heating, Ventilation and Air Conditioning: 65%<\/li>\n\n\n\n<li>Non-Inverter Machinery: 34%<\/li>\n\n\n\n<li>Standard lighting: 1%..<\/li>\n<\/ul>\n\n\n\n<p>Cabin 3- EP1600A:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Non-Inverter Machinery: 68%<\/li>\n\n\n\n<li>Machinery with inverter: 27%<\/li>\n\n\n\n<li>Heating, Ventilation and Air Conditioning: 3%<\/li>\n\n\n\n<li>Electronic lighting: 2%.<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"597\" height=\"334\" src=\"https:\/\/energia-europa.com\/wp-content\/uploads\/2025\/07\/2-SIT.png\" alt=\"\" class=\"wp-image-1250\" srcset=\"https:\/\/energia-europa.com\/wp-content\/uploads\/2025\/07\/2-SIT.png 597w, https:\/\/energia-europa.com\/wp-content\/uploads\/2025\/07\/2-SIT-300x168.png 300w\" sizes=\"auto, (max-width: 597px) 100vw, 597px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>In October 2015, the first 1600A EP device was installed in one of their plants. Over the following three months, two more 1000A devices and another 1600A device were installed on other lines in the same plant.<\/p>\n","protected":false},"featured_media":1255,"template":"","meta":{"_acf_changed":false},"applicazione-referenza":[53],"prodotto-referenza":[29],"class_list":["post-1974","referenza","type-referenza","status-publish","has-post-thumbnail","hentry","applicazione-referenza-metalworking-industry","prodotto-referenza-ep-x"],"acf":[],"_links":{"self":[{"href":"https:\/\/energia-europa.com\/en\/wp-json\/wp\/v2\/referenza\/1974","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/energia-europa.com\/en\/wp-json\/wp\/v2\/referenza"}],"about":[{"href":"https:\/\/energia-europa.com\/en\/wp-json\/wp\/v2\/types\/referenza"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/energia-europa.com\/en\/wp-json\/wp\/v2\/media\/1255"}],"wp:attachment":[{"href":"https:\/\/energia-europa.com\/en\/wp-json\/wp\/v2\/media?parent=1974"}],"wp:term":[{"taxonomy":"applicazione-referenza","embeddable":true,"href":"https:\/\/energia-europa.com\/en\/wp-json\/wp\/v2\/applicazione-referenza?post=1974"},{"taxonomy":"prodotto-referenza","embeddable":true,"href":"https:\/\/energia-europa.com\/en\/wp-json\/wp\/v2\/prodotto-referenza?post=1974"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}